IFT-TS 2026/03/09
top highlights
- Most CCs attended PSF and All Hands in Portugal.
- NIM team progressed Nimble release hardening and shipped 0.22.2.
- WEB shipped Status blog SEO improvements and progressed SN Hub, wallet-extension, logos-website, and cross-site maintenance updates.
team highlights
- DST: Improved KAD-DHT observability and local nim-libp2p integration while extending Nomos devnet diagnostics and dashboards.
- DST: Continued regression testing, analysis tooling refactors, and vaclab cluster stabilization with active cross-team reviews.
- NIM: Progressed Nimble release hardening and shipped 0.22.2 with cross-platform packaging and normalization fixes.
- NIM: Advanced nim core-libs work across json-rpc, language-server integration, maintenance, and Chronos documentation.
- QA: Advanced anoncomms and status-go functional testing, including hashgraph negatives, serialization hardening, and token-gated flows.
- QA: Continued messaging/python-bindings and desktop release-testing streams, plus Logos libp2p module test work.
- RFC: Continued RFC index maintenance with review/approval throughput.
- RFC: Progressed adversarial-spec workflow experimentation for RFC culture improvements.
- SC: Delivered research outputs for dead-shares and token-recovery AMM workstreams.
- SC: Continued AMM test-coverage work with follow-up implementation preparation.
- TKE: Finalized digital-twin model reimplementation and sensitivity analysis after team feedback.
- TKE: Coordinated xPrize and Logos PS activations, including budgeting, campaign planning, and workshop/open-house logistics.
- WEB: Shipped status.network SEO/blog improvements and status.app hidden-blog-post delivery.
- WEB: Progressed SN Hub and wallet-extension updates, plus Logos website and maintenance work.
ift-ts:bi:
other notes- Team attended PSF and All Hands in Portugal.
ift-ts:dst:
ift-ts:dst:anoncomms:2026q1-anoncomms-evaluation:kad-dht- Modified node setup to use local nim-libp2p code and exposed Kademlia
LookupStateattempts. - Standardized PeerID short-form logging in Chronicles.
- Modified node setup to use local nim-libp2p code and exposed Kademlia
ift-ts:dst:blockchain:2026q1-blockchain-evaluation:devnet- Investigated a Nomos blockchain memory issue with the team and validated follow-up behavior.
- Tested several images and added testnet dashboard panels for Nomos resource consumption.
ift-ts:dst:ift:2026q1-libp2p-evaluation:regression-testing- Ran lab debugging sessions and continued attempts to execute regression node tests.
ift-ts:dst:ift:2026q1-dst-tooling:analysis-yaml-refactor- Updated draft analysis bridge work in vacp2p/10ksim#209.
- Fixed local-cluster analysis flow and validated message-reliability plotting with VictoriaLogs and local logs.
ift-ts:dst:ift:2026q1-dst-lab:analyze-current-stack- Opened vacp2p/vaclab-2#15 and rebuilt the lab cluster repeatedly while testing Cilium/kube-ovn changes.
other notes- Team members attended All Hands and Parallel Society in Lisbon.
- Merged roadmap update vacp2p/roadmap#408.
- Held coordination sessions with AnonComms and QA, and completed interview scorecards.
- Reviewed status-im/infra-misc#469, vacp2p/vaclab-2#14, status-im/status-go#7352, and vacp2p/10ksim#207.
ift-ts:infra:
other notes- Team attended PSF and All Hands in Portugal.
ift-ts:nim:
ift-ts:nim:ift:2026q1-nimble:nimble-1.0.0- Merged nim-lang/nimble#1628, #1627, #1626, #1625, and #1623.
- Released Nimble
0.22.2.
ift-ts:nim:ift:2026q1-nim-core-libs:json-rpc- Continued CBOR serialization and unordered-response support in status-im/nim-json-rpc#260 and nitely/nim-json-rpc#4.
ift-ts:nim:ift:2026q1-nim-core-libs:language-server-editor-integration- Investigated misplaced inlay hints and traced root cause while iterating from nim-lang/langserver#381.
ift-ts:nim:ift:2026q1-nim-core-libs:maintenance- Progressed intops/stint maintenance, including local implementation work for borrow/carry helpers from vacp2p/nim-intops#22.
- Opened checked/wrapping arithmetic work in vacp2p/nim-intops#24.
ift-ts:nim:ift:2026q1-nim-core-libs:docs- Improved Chronos HTTP client tutorial includes and exception-handling guidance.
other notes- Added Nimble installation script work in nim-lang/nimble#1622.
ift-ts:p2p:
other notes- Team attended PSF and All Hands in Portugal.
ift-ts:qa:
ift-ts:qa:anoncomms:2026q1-anoncomms-testing:hashgraph-negative-tests- Merged proposal-vote lifecycle and timeout test coverage in vacp2p/hashgraph-like-consensus#9.
- Continued coverage expansion in vacp2p/hashgraph-like-consensus#10.
ift-ts:qa:anoncomms:2026q1-anoncomms-testing:serialization-ffi-errors- Continued overflow-panic coverage in vacp2p/zerokit#382 with follow-ups #383 and #384.
ift-ts:qa:status:2026q1-status-go-functional-testing:7128- Continued deployer-override refactor in status-im/status-go#7338 and token-gated test work in status-im/status-go#7215.
- Tracked related behavior in status-im/status-go#7167.
ift-ts:qa:messaging:2026q1-messaging-testing:maintenance- Tracked CI test failures daily and shared
v0.38.0reports with messaging teams (status-fleet, waku).
- Tracked CI test failures daily and shared
ift-ts:qa:messaging:2026q1-messaging-testing:python-bindings- Integrated wrappers in test framework module manager via logos-messaging/logos-delivery-interop-tests#159.
- Continued requested changes in logos-messaging/logos-delivery-python-bindings#3.
ift-ts:qa:ift:2026q1-nim-libp2p-testing:libp2p-module-tests- Merged logos-co/logos-libp2p-module#31 and #32.
- Continued draft relay-flow work in logos-co/logos-libp2p-module#35 and vacp2p/nim-libp2p#2146.
ift-ts:qa:status:2026q1-status-qa-desktop:maintenance- Investigated VM input visibility issue status-im/status-app#20154 and merged E2E adjustments #20153, #20142, and #20141.
- Closed dropped attempt status-im/status-app#20150 after deeper investigation.
ift-ts:qa:status:2026q1-status-qa-desktop:release-testing- Continued tracking release-testing issue status-im/status-app#20146.
ift-ts:qa:status:2026q1-status-go-functional-testing:maintenance- Continued Python SDK maintenance tasks in status-im/status-go#7098 and status-im/status-go#7352.
other notes- Team members attended PSF and All Hands in Portugal.
- OOO: 3 CC days.
ift-ts:rfc:
ift-ts:rfc:ift:2026q1-rfc-index-maintenance:maintenance- Reviewed, commented, and approved vacp2p/rfc-index#295.
ift-ts:rfc:ift:2026q1-rfc-culture-establishment- Built a local test RFC for ETH JSON-RPC using an adapted adversarial-spec workflow.
other notes- Team attended All Hands activities.
ift-ts:sc:
ift-ts:sc:logos:2026q1-amm-core-improvements:research-dead-shares- Published dead-shares research document.
ift-ts:sc:logos:2026q1-amm-core-improvements:research-token-recovery- Published token-recovery research document.
other notes- Added AMM test coverage.
- Team members attended PSF and All Hands in Portugal.
ift-ts:sec:
other notes- Team attended PSF and All Hands in Portugal.
ift-ts:tke:
vac:tke:ift:logos-token:logos-digital-twin- Finalized digital-twin model reimplementation after team feedback.
- Performed extensive single-step sensitivity analysis on model parameters.
vac:tke:blockchain:stress-test:hybrid-pow-pos- Met with Marcin to discuss hybrid PoW/PoS approach.
vac:tke:ift:ecodev:xprize- Collected remaining pre-PS items, allocated budget across prizes, and progressed the LEZ Ideas Sprint campaign.
vac:tke:ift:support-to-ift-units:logos-ps-activations- Coordinated PS/Logos activities, info-flyer logistics, and Logos Builder OpenHouse planning.
- Collected workshop/talk inputs for scheduling and drafted hackathon-experience notes for platform-provider sharing.
other notes- Team attended All Hands and Parallel Society activities.
- OOO: 1 CC days.
ift-ts:web:
ift-ts:web:status:2026q1-sn-website- Merged SEO/blog metadata work in status-im/status-web#1067 and locale-path refactor in #1070.
ift-ts:web:status:2026q1-sn-hub- Continued Karma SDK refactor and review cycle in status-im/status-web#1026.
ift-ts:web:status:2026q1-status-app- Merged hidden blog-post support in status-im/status-web#1068.
ift-ts:web:status:2026q1-status-wallet-extension- Added wallet connection permission-error handling in status-im/status-web#1014.
ift-ts:web:ift:2026q1-maintenance- Merged full chart data/scroll/navigation work in acid-info/admin-acid.logos.co#41.
- Merged newsletter unsubscribe/API integration in acid-info/admin-acid.logos.co#42.
ift-ts:web:logos:2026q1-logos-website- Continued Umami/Sanity tracking and related fixes in acid-info/logos#32.
ift-ts:web:status:2026q1-status-wallet-extension:global-password- Continued feedback iterations in status-im/status-web#976.
other notes- Team members attended PSF and All Hands in Portugal.