ift-ts:rfc:ift:2026q1-rfc-culture-establishment

Description

This commitment continues RFC culture establishment across IFT by adapting the adversarial-spec workflow, piloting it on practical RFC content, and sharing a reusable approach for cross-team RFC authoring.

Task List

Adversarial Spec Workflow Adaptation

  • fully qualified name: ift-ts:rfc:ift:2026q1-rfc-culture-establishment:adversarial-spec-workflow-adaptation
  • owner: filip
  • status: in progress (20%)
  • start-date: 2026/01/01
  • end-date: 2026/03/31

Description

Adapt and validate an adversarial-spec workflow for IFT RFC production by producing pilot outputs and documenting practical usage patterns for ongoing adoption.

Deliverables

  • Built a local ETH JSON-RPC test RFC using the adapted adversarial-spec workflow.
  • Pilot RFC draft using the adapted adversarial-spec workflow.
  • Usage notes for applying the workflow to IFT and Logos RFC authoring.
  • Follow-up iteration plan based on feedback from early adopters.