0
Teams
0
GitHub Links
Link Types:GitHubInternal (roadmap.vac.dev)ExternalTask ID

IFT-TS 2026/02/09

top highlights

  • P2P advanced nim-libp2p cbindings, gossipsub partial-messages, and Logos core module support, while QA expanded Kad-DHT automation.
  • Security conducted an internal Keycard audit and identified multiple issues and vulnerabilities for remediation follow-up.

team highlights

  • BI: Updated Logos funnel and circle monitoring dashboards, including forum data ingestion, while continuing smart-contract monitoring rollout.
  • BI: Calculated PnL and started test automation to validate finance reporting outputs.
  • DST: Merged and opened multiple 10ksim tooling changes across builders, formatting, annotations, and metadata bridge preparation.
  • DST: Advanced vaclab stack analysis with external-node deployment updates, data-usage dashboards, and component-level investigation planning.
  • INFRA: Stabilized critical infra by resolving logging, sync, and OOM incidents across LIDO, Nimbus, and Status fleets.
  • INFRA: Continued CI and platform upgrades, including nix-darwin migration work, runner rollout, and license-compliance automation.
  • NIM: Landed a large Nimble 1.0.0 maintenance batch across lockfile, cache, install, and command behavior fixes.
  • NIM: Progressed core libs with JSON-RPC CBOR support, intops validation in Nimbus clients, and Chronos tutorial documentation.
  • P2P: Improved nim-libp2p maintenance for Nimbus compatibility and continued QUIC-related follow-up work.
  • P2P: Advanced cbindings, gossipsub partial-messages, and Logos core module support with active PRs across repos.
  • QA: Expanded coverage for RLN, messaging network conditions, nim-libp2p mix tests, and Status desktop/mobile E2E suites.
  • QA: Progressed token-gated Status-go functional tests and continued stabilization work for desktop and mobile automation.
  • RFC: Merged and reviewed RFC-index updates across datasets, OpChan, and Merkle tree iterations.
  • RFC: Continued spec-culture and RFC-process support activities, including tooling and template preparation for project leads.
  • SC: Progressed Status L2 contract maintenance and delivered docs/deployment updates in monorepo and token-v2 repos.
  • SC: Continued attestation-track exploration with presentation delivery and prototype implementation work in LSSA-related code.
  • SEC: Hardened secure-signing operations with localsafe image deployment and Safe transaction workflow monitoring.
  • SEC: Continued audit and incident follow-up work across Keycard, CI/release workflows, and infra remediation validation.
  • TKE: Advanced Logos tokenomics across digital-twin baselining, fundraise modeling, litepaper drafting, and LBP simulation.
  • TKE: Progressed Nomos stress-test design and broader cross-unit support for PS activations, incentive planning, and research outputs.
  • WEB: Advanced SN Hub work through proxy refactoring, QA wallet coordination, and Karma SDK implementation scaffolding.
  • WEB: Continued wallet extension and maintenance delivery with QA fixes, NFT endpoint updates, and connector/content improvements.

ift-ts:bi:

ift-ts:dst:

ift-ts:infra:

  • lido
    • Fixed LokiDB compactor configuration and purged old logs.
    • Reduced Nimbus beacon-node log volume by adjusting log levels.
    • Handled fallout from a Nimbus bug that broke mainnet BN syncing.
  • ethctv
    • Continued work on the new LIDO v3 EthCTV cluster with Obol on Hoodi.
  • nimbus
    • Enabled WebSocket connections on the Ethereum archive node for BI.
  • waku
    • Investigated improved alerting for status.prod Waku nodes.
  • logos
    • Re-activated the Logos Apple developer account for POC release builds.
    • Continued debugging Logos POC builds on macOS.
    • Continued Nix derivation integration with Nimble for Nim repos.
  • status
    • Reviewed Nix-based dependency build fixes with the team.
    • Debugged Rarible API limit regressions and supported NFT proxy mitigation.
    • Fixed a broken Status Control node after OOM-killer interruption.
  • sites
    • Tested backup/restore procedures for Aptly.
    • Fixed Ecosystem CPS and Status Hub COOP/redirect issues.
    • Disabled Cloudflare tracking script injection for affected sites.
  • office
    • Deployed the production Vesting Tool for Finance.
    • Researched OpenKM migration options and CMS stack candidates for Logos.
  • bi
    • Deployed a new Ethereum Vault monitoring service.
  • hq
    • Fixed Wazuh certificate issues by identifying an indexer-config bug.
    • Continued Atlantis research for Terraform plan automation.
    • Continued Elasticsearch index-layout improvements for cleanup.
  • ci
    • Continued nimbus-build-system derivation rollout.
    • Progressed migration from Homebrew to nix-darwin on CI hosts.
    • Added missing MIT licenses to infra repositories.
    • Added Windows GitHub runner hosts and created an Ansible role.
    • Investigated GitHub runner analytics and continued Nix cache-cleanup scripting.

ift-ts:nim:

ift-ts:p2p:

ift-ts:qa:

ift-ts:rfc:

  • ift-ts:rfc:codex:2026q1-rfc-iteration
  • ift-ts:rfc:ift:2026q1-rfc-index-maintenance:maintenance
  • ift-ts:rfc:anoncomms:2026q1-rfc-iteration:opchan
    • Fixed and merged OpChan.
  • admin/misc
    • Held a call with Corey on spec-culture improvements and feedback loops.
    • Prepared a tool to support project leads with drafting specs.
    • Reviewed RFC roadmap tasks; most are now closeable, with remaining focus on culture, docs coexistence, and lead support templates.

ift-ts:sc:

ift-ts:sec:

  • ift:2026q1-secure-signing-environment:build-secure-signing-workstation
    • Deployed a hardened localsafe Docker image.
  • ift:2026q1-security-workflow-automation:deploy-independent-safetx-monitoring-tools
    • Tested workflow automation for Safe transaction-status monitoring.
  • ift:2026q1-cicd-security-review:follow-up-code-reviews
    • Continued deeper internal Keycard audits across error handling, update flow, and core_btc.
    • Re-reviewed CI, GitHub Actions, and release workflows for permission drift and secret handling.
  • ift:2026q1-vulma-and-ir:incident-follow-ups
    • Followed up on Status Mailgun subdomain hijack remediation.
    • Performed post-remediation checks for the Waku node incident.
    • Validated infra cleanup that removed unused domains.

ift-ts:tke:

  • admin
    • Wrote the deliverables report.
  • ift-ts:tke:ift:logos-token:logos-digital-twin
    • Defined a baseline configuration.
    • Adapted baseline parameters to values extractable from real data.
  • ift-ts:tke:ift:logos-token:litepaper
    • Prepared the tokenomics section of the litepaper.
  • ift-ts:tke:ift:logos-token:fundraise
    • Automated the token sales model.
    • Proposed a token comparison framework and compared LOGOS with peer tokens.
    • Continued allocation-issue work.
  • ift-ts:tke:ift:logos-token:lbp
    • Worked on the LBP explainer and simulator.
  • ift-ts:tke:ift:logos-token:logos-stablecoin
    • Finished stablecoin-related work.
  • ift-ts:tke:status:karma-incentives
    • Reviewed the new deployment changelog.
    • Analyzed required changes for staking demo app migration.
  • ift-ts:tke:ift:ecodev:xprize
    • Gathered feedback on lambda-prize approach and prize sizing.
  • ift-ts:tke:ift:support-to-ift-units:logos-ps-activations
    • Coordinated PS presence and workshops with Logos Messaging, Keycard, and other teams.
    • Planned announcement/demo alignment with app/core stakeholders.
  • ift-ts:tke:blockchain:stress-test:nomos-dse
    • Finished DSE specs and reviewed Nomos team comments.
  • ift-ts:tke:blockchain:stress-test:review-params
    • Continued parameter-specification work.
  • ift-ts:tke:ift:support-to-ift-units:reading-by-jarrad
    • Continued reading on virtual worlds and economies.
  • ift-ts:tke:ift:tokenomics-research-forum:opt-control
    • Submitted work to an ICLR workshop.
  • ift-ts:tke:ift:tokenomics-research-forum:brazilian-nuts
    • Formalized the model.

ift-ts:web: