ift-ts:dst:status:2026q4-status-evaluation
Description
TBD
Background
TBD
Task list
Reliability
- fully qualified name:
ift-ts:dst:status:2026q4-status-evaluation:reliability - owner: Alberto
- status: in progress (99%)
- start-date: 2026/10/01
- end-date: 2026/12/31
Description
Compare results with old status-go.
Deliverables
- Github PRs:
- Rebuilt Status develop commit
6fbaa6af0ee90100c93380f3b04fdd57433cd273as a Docker image. - Adapted and redeployed Status benchmark utilities in the lab.
- iftech/status-benchmarks#45 Updates
- iftech/status-benchmarks#47 Add plots
- Status analysis branch.
- status-im/status-go#8036 [Epic] Optimizing messaging pipeline
- Replaced the receiver’s sliding debounce with a fixed batch window; the first fix reduced median delivery from about 120 seconds to 17 seconds.
- Rebuilt Status develop commit
- Documents:
- Identified a light-node rate-limiter timing mismatch causing valid messages to remain pending in MVDS and arrive minutes late.
- Identified a feedback loop in which delayed processing delays acknowledgements, triggers MVDS retransmissions, and increases the processing backlog.
- Status delay investigation.
- Measured initial p95 delivery of 31 seconds and maximum delivery of 35 seconds, down from 197 and 226 seconds; arrival-to-processing time fell from 122 seconds to 0.7 seconds.
- Identified incoming rate-limit drops of acknowledgements and online-notification delays as causes of MVDS retries and duplicate messages.
- Reduced median delivery from 130 seconds to 1.4 seconds, p95 from 197 seconds to 2.11 seconds, and maximum from 226 seconds to 3.45 seconds in the latest experiment.
- Recorded no deliveries over 10 seconds in 38,000 messages, compared with 7,556 of 7,600 previously, and reduced MVDS retransmissions from thousands to zero.
- Status delivery latency investigation
Logos delivery integration
- fully qualified name:
ift-ts:dst:status:2026q4-status-evaluation:logos-delivery-integration - owner: TBD
- status: not started
- start-date: 2026/10/01
- end-date: 2026/12/31
Description
Compare results with old status-go.
Deliverables
- Github PRs:
- Documents: