ift-ts:dst:logos:2026q4-messaging-evaluation
Description
Test Messaging on each new version or requested feature and look for regressions, learn scaling properties and run scaling studies, understand the limits of Messaging and its behaviour. Deliver reports and actionable insights. Do this monthly, reliably, with documentation of findings.
Task list
Regression testing (recurring)
- fully qualified name:
ift-ts:dst:logos:2026q4-messaging-evaluation:regression-testing - owner: Alan
- status: in progress (25%)
- start-date: 2026/10/01
- end-date: 2026/12/31
Description
Run different scenarios and collect evidence and data of Messaging’s behaviour.
Test for known regressions that have occurred in the past and ensure they don’t happen again.
Deliverables
- Code:
- iftech/10ksim#415 Full logos delivery experiment
- iftech/10ksim#416 Subscribe the filter clients in full logos delivery and keep them subscribed
- iftech/10ksim#417 Check each store node’s archive in full logos delivery
- iftech/10ksim#411 Delivery latency per path and resources per node type for logos delivery runs
- Reports:
- Completed a full relay, lightpush, filter, and store run for Logos Messaging PR 4347.
- Repeated the PR 4347 full delivery test three times at the configured publish rate to validate the full delivery report.
load metric
- fully qualified name:
ift-ts:dst:logos:2026q4-messaging-evaluation:load-metric - owner: TBD
- status: not started
- start-date: 2026/10/01
- end-date: 2026/12/31
Description
Include new metric (event_loop_accumulated_lag_secs) for load in logos-delivery experiments introduced in https://github.com/logos-messaging/logos-delivery/pull/3833
Deliverables
- Code:
- Reports:
Scalable Data Sync
Note: This needs more input from project
- fully qualified name:
ift-ts:dst:logos:2026q4-messaging-evaluation:scalable-data-sync - owner: TBD
- status: not started
- start-date: 2026/10/01
- end-date: 2026/12/31
Description
TBD
Deliverables
- Code:
- Reports:
Reliable Channel API — General Availability
Note: This needs more input from project
- fully qualified name:
ift-ts:dst:logos:2026q4-messaging-evaluation:reliable-channel-api - owner: TBD
- status: not started
- start-date: 2026/10/01
- end-date: 2026/12/31
Description
TBD
Deliverables
- Code:
- Reports:
RLN on Logos Blockchain
Note: This needs more input from project
- fully qualified name:
ift-ts:dst:logos:2026q4-messaging-evaluation:rln-logos-blockchain - owner: TBD
- status: not started
- start-date: 2026/10/01
- end-date: 2026/12/31
Description
TBD
Deliverables
- Code:
- Reports: