ift-ts:dst:logos:2026q3-messaging-evaluation
Description
Test Messaging on each new version or requested feature and look for regressions, learn scaling properties and run scaling studies, understand the limits of Messaging and its behaviour. Deliver reports and actionable insights. Do this monthly, reliably, with documentation of findings.
Task list
Regression testing (recurring)
- fully qualified name:
ift-ts:dst:logos:2026q3-messaging-evaluation:regression-testing - owner: TBD
- status: not started
- start-date: 2026/07/01
- end-date: 2026/09/30
Description
Run different scenarios and collect evidence and data of Messaging’s behaviour.
Test for known regressions that have occurred in the past and ensure they don’t happen again.
Deliverables
- Code:
- Reports:
load metric
- fully qualified name:
ift-ts:dst:logos:2026q3-messaging-evaluation:load-metric - owner: TBD
- status: not started
- start-date: 2026/07/01
- end-date: 2026/09/30
Description
Include new metric (event_loop_accumulated_lag_secs) for load in logos-delivery experiments introduced in https://github.com/logos-messaging/logos-delivery/pull/3833
Deliverables
- Code:
- Reports:
quic vs tcp
- fully qualified name:
ift-ts:dst:logos:2026q3-messaging-evaluation:quic-vs-tcp - owner: Pearson
- status: done
- start-date: 2026/07/08
- end-date: 2026/07/21
Description
Analyze logos messaging using quic from nimlibp2p and compare results with mplex/yamux.
Deliverables
- Code:
- QUIC connectivity fix branch and
pearsonwhite/nwaku:quic-b778d16image
- QUIC connectivity fix branch and
- Reports:
Logos delivery node
- fully qualified name:
ift-ts:dst:logos:2026q3-messaging-evaluation:logos-delivery-node - owner: Pearson
- status: in progress (95%)
- start-date: 2026/07/28
- end-date: 2026/08/07
Description
Try new image provided by logos-messaging introduced in this PR Note: REST API interface Build image and reproduce some experiments to see if results match and if we need to do modifications in our framework.
Deliverables
- Code:
- Reports:
- nWaku delivery node analysis
- Completed the reliability experiment matrix successfully and produced message-delay plots, with one clock-skew anomaly documented for follow-up.
Scalable Data Sync
Note: This needs more input from project
- fully qualified name:
ift-ts:dst:logos:2026q3-messaging-evaluation:scalable-data-sync - owner: TBD
- status: not started
- start-date: 2026/07/01
- end-date: 2026/09/30
Description
TBD
Deliverables
- Code:
- Reports:
Reliable Channel API — General Availability
Note: This needs more input from project
- fully qualified name:
ift-ts:dst:logos:2026q3-messaging-evaluation:reliable-channel-api - owner: TBD
- status: not started
- start-date: 2026/07/01
- end-date: 2026/09/30
Description
TBD
Deliverables
- Code:
- Reports:
Chat Reliability
Note: This needs more input from project
- fully qualified name:
ift-ts:dst:logos:2026q3-messaging-evaluation:chat-reliability - owner: TBD
- status: not started
- start-date: 2026/07/01
- end-date: 2026/09/30
Description
TBD
Deliverables
- Code:
- Reports:
RLN on Logos Blockchain
Note: This needs more input from project
- fully qualified name:
ift-ts:dst:logos:2026q3-messaging-evaluation:rln-logos-blockchain - owner: TBD
- status: not started
- start-date: 2026/07/01
- end-date: 2026/09/30
Description
TBD
Deliverables
- Code:
- Reports: